Last minute

Azerbaijan Railways CJSC

Azerbaijan gets work on railway bridge done over Hakari river

Baku. TurkicWorld:

Work on the railway bridge over the Hakari river is nearing completion, Azerbaijan Railways CJSC told TurkicWorld.

According to the information, the bridge will be 418 meters long and 6.5 meters wide.

In addition, the work on this bridge is an integral part of the construction of the Horadiz-Aghband railway line.

"The railway line has a single-track traffic system, and its length along the axis is 110.4 kilometers. There will be nine stations on the line (Horadiz, Merjanli, Mahmudlu, Sultanli, Kumlak, Hakari, Mincivan, Bartaz, Aghband). As part of the project, 456 artificial engineering structures will also be put into operation," Azerbaijan Railways said.

Related articles